All SBPL locations will be closed from Thursday November 28 through Friday, November 29 for Thanksgiving.

11042
Title

Construction Projects

Sections
Filter Results
Rendering of an example landscaped peninsula on 200 block of North Alisos Street
The Eastside neighborhood of Santa Barbara has a propensity for walking and biking and it needs safe and easy connections.
Granda Garage proposed exterior solar photovoltaic system
On August 21, 2023 the City of Santa Barbara began construction on a 425 kilowatt (kW) solar photovoltaic system and battery energy storage system (BESS) at the Granada Garage.
Overhead view of the Granada Garage Solar Project.
Completed in 2024, the Granada Garage Solar Project included the installation of a 425 kilwatt (kW) solar photovoltaic system and battery energy storage system (BESS) at the Granada Garage. The project generates, stores, and supplies…
Honda Valley Creek at Honda Valley Park
The Creeks Division completed a restoration of Arroyo Honda at Honda Valley Park in 2021. The project included removal of approximately 1,000 square feet of asphalt from the creek bed, removal of over 650 linear feet of chain link fence,…
Las Positas Modoc Road Bicycle & Pedestrian Path Project - completed pathway
This project proposes to construct a 2.6 mile-long separated pathway for bicyclists, runners, and pedestrians of all ages and abilities along Las Positas and Modoc Roads.
Photo of the historic Los Patos Union Pacific Railroad Bridge facing the US 101 Freeway offramp
The Project involves the removal of the Los Patos Way Off-Ramp Underpass (Los Patos Underpass), Bridge No. 51-0235, and the construction of a shoofly (rail bypass) to allow continued train travel during the construction of a new rail…
Rendering of potential pedestrian and bicycle U.S. Highway 101 overcrossing
The City is developing the Lower Eastside Community Connectivity Active Transportation Plan to identify ways to improve walking and bicycling access between the Lower Eastside Neighborhood and destinations south of U.S. Highway 101.
Mission Creek at East Beach with Stearns Wharf
The Lower Mission Creek Flood Control Project (Project) has been a joint project of the Santa Barbara County Flood Control and Water Conservation District (District) and the City of Santa Barbara (City), for many years. The Project is…
Total results: 57 7