All SBPL locations will be closed from Thursday November 28 through Friday, November 29 for Thanksgiving.

11042
Title

Construction Projects

Sections
Filter Results
Permeable Pavers
The Creeks Division has installed permeable pavers in City-owned parking lots, sidewalks, streets, alleys, and parks in several locations, in order to allow storm water and urban runoff to infiltrate into the ground.
Plaza del Mar Band Shell and surrounding trees
The Plaza del Mar Band Shell Renovation Project aimed to return a vibrant space for music, art, culture, and community events to one of Santa Barbara's oldest parks.
Franceschi House appears through trees
The Reimagining of Franceschi House aims to create an open-air public space that honors the legacy of the building and its previous owners, botanist Francesco Franceschi and social reformer and philanthropist Alden Freeman.
Close up of electric vehicle charger and people walking into a home in the background with Santa Barbara Clean Energy logo
Santa Barbara Clean Energy's Residential EV Program is designed to make switching to electric transportation easier and
Santa Barbara Police Station Project.jpg
The existing Santa Barbara City Police Station, located at 215 East Figueroa Street, was constructed in 1959. Since that time, there have been substantial increases in both City population and Police Department staff. In addition, the…
Santa Barbara Airport FAA Tower with mountains backdrop
The FAA is requiring SBA bring the airfield into compliance with FAA Engineering Brief 89 regarding taxiway naming conventions.  FAA Engineering Brief requirements are now contained in FAA Advisory Circulars and provide the Airport…
Environmental Canine Services staff and dogs Sable and Logan investigate storm drains
In 2010 the Creeks Division received grant funding from the Water Environment Research Foundation for the Canine and Microbial Source Tracking Project. The Canine and Microbial Source Tracking Project built on efforts to identify and…
Heavy equipment in street installing Haley Street CDS (continuous deflection system) unit
Constructed in 2006, the purpose of these two storm drain diversions was to improve summer water quality in creeks and beaches in the City of Santa Barbara. The projects diverted dry weather flow (urban runoff) at the Hope…
Storm drain screen on a City street
In 2011, the Creeks Division  installed storm drain screens in nearly all of the storm drain openings in the City (approximately 1400 inlets).  The retractable screens keep trash from entering the storm drains, which lead to the…
Total results: 57 7