All SBPL locations will be closed from 12/22 through 12/26 and on 1/1/26 for the winter holidays. For all the details about adjusted hours and closures, visit our Winter Holiday Hours page.

17112
ID
Sewer Lateral
Title

REMINDER: All Sewer Lateral Repairs Require a Permit

Authored on
Body

All sewer lateral repairs require a permit, including lateral lining and backwater valve installations. Sewer Lateral Inspection Program (SLIP) participants must provide a copy of their permit(s) (some repairs require both a Public Works and Building and Safety permit) to staff to have their case closed. 

You can read more here.