Offshore Desal Pump Platform Stabilization Project

Sidebar Widgets

Contact Info

Name: Kris Ahrens
Phone: (805) 564-5456
Email: KAhrens@SantaBarbaraCA.gov

By the Numbers

Amount of Rock Placed: 450 tons.
Design Life: 50 years.
Project Cost: $5.1 M.
Barge Size: 270 feet.