Pedestrian and Bicycle Improvements Project on East Cabrillo Boulevard & the Replacement of the Union Pacific Railroad Bridge Project
The second phase of a larger project on East Cabrillo Boulevard between Los Patos Way and the Cabrillo/Highway 101 Interchange will replace the narrow, existing UPRR Bridge with a new bridge spanning over a widened roadway with standard lane widths, shoulders, and pedestrian and bicycle facilities. Intersection operations will also be improved with a proposed dedicated right-turn lane on eastbound Cabrillo Boulevard onto the proposed southbound Highway 101 on-ramp. Construction is anticipated to begin in 2027.
The Project’s first phase included the construction of a roundabout at the intersection of Cabrillo Boulevard and Los Patos Way with pedestrian and bicycle improvements. Construction of the roundabout (Phase 1) began in February 2024 and was completed in May 2025.