Wastewater Collection truck feeding a pipe into a drain hole.
Title

Wastewater Main Rehabilitation Project

Authored on
Body

Beginning in April, 2.6 miles of City sewer pipe will be rehabilitated. Pipes were selected based on material or age, as some date back to the 1920s. Contractors will clean and video-inspect the pipes from street manholes and then use both trenchless and traditional trenching methods for the work. Learn more.