Central Library will open at 11:00 AM on Tuesday, October 27th. 

20688

The Plane Pull returns to SBA October 24! Register your team today. 

20681

Welcome to Santa Barbara Clean Energy's new website. You're in the right place!
Please explore the site and feel free to contact us with any questions - we're here to help.

20674
Title

O & M Manual

Sections
14 Tertiary Treatment
The Contact Basin provides disinfection in conjunction with the baffled recycled water reservoir for the recycled water system. Analytical…

SOP Content Pages

Emergency backup power is typically provided to the Distribution Pump Station by the 2 MW Emergency Generator. If the public utility…
Emergency backup power is typically provided to the Distribution Pump Station by the 2 MW Emergency Generator. If the public utility…
The Distribution Pump Station is equipped with five pumps.  Two pumps are variable speed and the other three pumps are constant speed.…
The Distribution Pump Station is equipped with 2 variable speed pumps {tag nos. 1404PMP/MTR/VFD4100 & 1404PMP/MTR/VFD4200} and 3…
The Distribution Pump Station is equipped with 2 variable speed pumps {tag nos. 1404PMP/MTR/VFD4100 & 1404PMP/MTR/VFD4200} and 3…
During typical operation of the Reclaimed Water System, the DPS Pumps {tag no. 1404PMP4100, 1404PMP41200, 1404PMP4300, 1404PMP4400,…
Total results: 1 1

Plant Schematic

El Estero Schematic Drawing