We are working on economic and public safety response time analysis. Our next City Council meeting on the State Street Master Plan is anticipated in September 2025. 

14531

Faulkner Gallery will be closed for audiovisual upgrades. 
The Eastside Library will be partially closed from July 7-12.

14416

All SBPL locations will open late on Thursday, July 3. Visit our calendar for details.
All SBPL locations will be closed on Friday, July 4, for Independence Day.

14350
Title

O & M Manual

Sections
15 Solids Handling
3 polymer systems service the thickening and dewatering processes:2 Liquid Polymer Systems for Dewatering1 Dry Polymer System for…

SOP Content Pages

This SOP is only necessary if the polymer pumps are being taken out of service. It should be noted that the Liquid Polymer system is…
 This SOP can be skipped when the Filter Feed Pumps have been running normally and are under AUTO control by the Belt Filter Press.One…
The Belt Press Filter cannot operate without polymer conditioning. If the Dry Polymer System is out of service, the Liquid Polymer System…
The Belt Press Filter cannot operate without polymer conditioning. If the Dry Polymer System is out of service, the Liquid Polymer System…
Total results: 1 1

Plant Schematic

El Estero Schematic Drawing