We are working on economic and public safety response time analysis. Our next City Council meeting on the State Street Master Plan is anticipated in September 2025. 

14531

Faulkner Gallery will be closed for audiovisual upgrades. 
The Eastside Library will be partially closed from July 7-12.

14416

All SBPL locations will open late on Thursday, July 3. Visit our calendar for details.
All SBPL locations will be closed on Friday, July 4, for Independence Day.

14350
Title

O & M Manual

Sections
12 Secondary Treatment
Primary Effluent feeds the Secondary Treatment Process. Six Aeration Basins are equipped with aeration systems and analytical control…

SOP Content Pages

Air flow to the aeration basin grid system is distributed via a common airline that is equipped with isolation valves.  The Operator…
The Secondary Polymer System is not used during normal Secondary Treatment operations.   A Polymer Solution is introduced to the…
Total results: 1 1

Plant Schematic

El Estero Schematic Drawing