TRAVEL NOTICE 6/29–7/18: HWY 217 between Hollister Ave and Sandspit Rd will be closed overnight (10 PM–6 AM) from Monday night through Saturday morning each week. Please use HWY 101/Fairview Ave exits or an alternate route. Project info

19358
Title

O & M Manual

Sections
12 Secondary Treatment
Primary Effluent feeds the Secondary Treatment Process. Six Aeration Basins are equipped with aeration systems and analytical control…

SOP Content Pages

Air flow to the aeration basin grid system is distributed via a common airline that is equipped with isolation valves.  The Operator…
The Secondary Polymer System is not used during normal Secondary Treatment operations.   A Polymer Solution is introduced to the…
Total results: 1 1

Plant Schematic

El Estero Schematic Drawing