All SBPL locations will be CLOSED on Thursday, November 26 and Friday November 27, for Thanksgiving. Outdoor book returns will be closed during this closure. Due dates will be pushed forward. You can access our digital library 24/7.

21465

Share your ideas for the future of Santa Barbara's parks, open spaces, recreation facilities, and programs by taking the Parks and Recreation Master Plan Survey and enter a drawing to win a $500 prepaid Visa gift card!

21438
Title

O & M Manual

Sections
16 Utility Systems
Elutrient Water is pulled from the Secondary Effluent and piped to various locations at the WWTP for industrial use. The Elutrient Pumps…

SOP Content Pages

The Elutrient Pumps are in operation while the Gravity Thickener is in service. Elutrient pump operation is typically controlled by…
The Elutrient Pumps are in operation while the Gravity Thickener is in service. Elutrient pump operation is typically controlled by…
Total results: 1 1

Plant Schematic

El Estero Schematic Drawing