We are working on economic and public safety response time analysis. Our next City Council meeting on the State Street Master Plan is anticipated in September 2025. 

14531

The Eastside Library will be partially closed from July 7-12.

14416
Title

O & M Manual

Sections
16 Utility Systems
Elutrient Water is pulled from the Secondary Effluent and piped to various locations at the WWTP for industrial use. The Elutrient Pumps…

SOP Content Pages

The Elutrient Pumps are in operation while the Gravity Thickener is in service. Elutrient pump operation is typically controlled by…
The Elutrient Pumps are in operation while the Gravity Thickener is in service. Elutrient pump operation is typically controlled by…
Total results: 1 1

Plant Schematic

El Estero Schematic Drawing