Heatwave Forecast & Potential PSPS in Parts of Santa Barbara County | Ola de calor pronosticada y posible corte de energía en partes del condado de Santa Bárbara

15265

All SBPL locations will open at 12:30 PM on Thursday August 27th. All due dates will be pushed forward. You can access our digital library 24/7.

19832
Title

O & M Manual

Sections
12 Secondary Treatment
The Waste Activated Sludge process is currently out of service while Wasting from the Secondary System is being achieved by Waste Mixed…

SOP Content Pages

Two 10 HP, variable speed, non-clog type pumps each with a capacity of 3750 gpm make up the WAS Pumping System. The Lead/Lag status of the…
Total results: 1 1

Plant Schematic

El Estero Schematic Drawing