The Montecito Branch book drop will be closed May 3rd - 6th due to parking lot repaving

18477

Help shape the future of Santa Barbara's Waterfront! Respond to our survey at SantaBarbaraCA.gov/WaterfrontSurvey.
¡Ayúdanos a dar forma al futuro de la zona costera de Santa Bárbara! Responde a nuestra encuesta en SantaBarbaraCA.gov/WaterfrontSurvey.

18380

All SBPL locations will be closed on Tuesday, May 5, 2026 (5/5/26) for a staff training.

Eastside and Montecito Libraries will close at 2pm on Wednesday, May 6, 2026 (5/6/26) for a staff training.

18362
Title

O & M Manual

Sections
12 Secondary Treatment
The Return Activated Sludge process is powered by 4 centrifugal pumps that pump the sludge from a wet well back to the aeration basins.…

SOP Content Pages

Three 30 HP, variable speed, non-clog type pumps each with a capacity of 3750 gpm make up the RAS Pumping System. Two pumps provide…
Total results: 1 1

Plant Schematic

El Estero Schematic Drawing