Title

O & M Manual

Sections
10 Preliminary Treatment
The primary objective of the Preliminary Treatment System is to prepare raw sewage for further treatment in the downstream processes.…
10 Preliminary Treatment
This is a placeholder for the septic receiving station.
10 Preliminary Treatment
The primary objective of the Preliminary Treatment System is to prepare raw sewage for further treatment in the downstream processes.…
10 Preliminary Treatment
The primary objective of the Preliminary Treatment System is to prepare raw sewage for further treatment in the downstream processes.…
10 Preliminary Treatment
The primary objective of the Preliminary Treatment System is to prepare raw sewage for further treatment in the downstream processes.…

SOP Content Pages

Grit production below 160 gpm may indicate an obstruction in the grit system.  A typical obstruction occurs in one of the grit hoppers…
The Grit Pumps and Hydrogritter operate independently of each other.  During normal operation, influent (containing grit) is pumped by…
This SOP covers procedures to be performed when it is anticipated that the El Estero Wastewater Treatment Plant will receive high influent…
The Grit Pumps and Hydrogritter operate independently of each other.  During normal operation, influent (containing grit) is pumped by…
Total results: 5 1

Plant Schematic

El Estero Schematic Drawing