The Montecito Branch book drop will be closed May 3rd - 6th due to parking lot repaving

18477

Help shape the future of Santa Barbara's Waterfront! Respond to our survey at SantaBarbaraCA.gov/WaterfrontSurvey.
¡Ayúdanos a dar forma al futuro de la zona costera de Santa Bárbara! Responde a nuestra encuesta en SantaBarbaraCA.gov/WaterfrontSurvey.

18380

All SBPL locations will be closed on Tuesday, May 5, 2026 (5/5/26) for a staff training.

Eastside and Montecito Libraries will close at 2pm on Wednesday, May 6, 2026 (5/6/26) for a staff training.

18362
Title

O & M Manual

Sections
12 Secondary Treatment
The Waste Activated Sludge process is currently out of service while Wasting from the Secondary System is being achieved by Waste Mixed…

SOP Content Pages

Two 10 HP, variable speed, non-clog type pumps each with a capacity of 3750 gpm make up the WAS Pumping System. The Lead/Lag status of the…
Total results: 1 1

Plant Schematic

El Estero Schematic Drawing