15 Solids Handling
Thickened Pump Sludge Pump Station pumps from the Gravity Thickener and Dissolved Air Flotation Thickener to the Anaerobic Digesters. The…

SOP Content Pages

The Thickened Sludge Pump Station is equipped with three variable speed progressive cavity pumps.  The general function of each pump…