Public Safety Power Shutoffs (PSPS) under consideration in Parts of Santa Barbara County.

14387

We are working on economic and public safety response time analysis. Our next City Council meeting on the State Street Master Plan is anticipated in September 2025. 

14531

The Eastside Library will be partially closed from July 7-12.

14416
Title

O & M Manual

Sections
15 Solids Handling
Thickened Pump Sludge Pump Station pumps from the Gravity Thickener and Dissolved Air Flotation Thickener to the Anaerobic Digesters. The…

SOP Content Pages

The Thickened Sludge Pump Station is equipped with three variable speed progressive cavity pumps.  The general function of each pump…
Total results: 1 1

Plant Schematic

El Estero Schematic Drawing