The Montecito Branch book drop will be closed May 3rd - 6th due to parking lot repaving

18477

Help shape the future of Santa Barbara's Waterfront! Respond to our survey at SantaBarbaraCA.gov/WaterfrontSurvey.
¡Ayúdanos a dar forma al futuro de la zona costera de Santa Bárbara! Responde a nuestra encuesta en SantaBarbaraCA.gov/WaterfrontSurvey.

18380

All SBPL locations will be closed on Tuesday, May 5, 2026 (5/5/26) for a staff training.

Eastside and Montecito Libraries will close at 2pm on Wednesday, May 6, 2026 (5/6/26) for a staff training.

18362
Title

O & M Manual

Sections
15 Solids Handling
Thickened Pump Sludge Pump Station pumps from the Gravity Thickener and Dissolved Air Flotation Thickener to the Anaerobic Digesters. The…

SOP Content Pages

The Thickened Sludge Pump Station is equipped with three variable speed progressive cavity pumps.  The general function of each pump…
Total results: 1 1

Plant Schematic

El Estero Schematic Drawing