All locations will open at 11am on Sept. 23, 2025 for staff training.

15407
Title

O & M Manual

Sections
11 Primary Treatment
The main objective of the Primary Treatment System is to physically separate waste solids from the liquid stream through a clarification…

SOP Content Pages

Starting up a clarifier involves putting the scum collector and sludge collection units into service. Also, open the valves on the…
Total results: 1 1

Plant Schematic

El Estero Schematic Drawing