We are working on economic and public safety response time analysis. Our next City Council meeting on the State Street Master Plan is anticipated in September 2025. 

14531

Faulkner Gallery will be closed for audiovisual upgrades. 
The Eastside Library will be partially closed from July 7-12.

14416

All SBPL locations will open late on Thursday, July 3. Visit our calendar for details.
All SBPL locations will be closed on Friday, July 4, for Independence Day.

14350
Title

O & M Manual

Sections
10 Preliminary Treatment
The primary objective of the Preliminary Treatment System is to prepare raw sewage for further treatment in the downstream processes.…

SOP Content Pages

Grit production below 160 gpm may indicate an obstruction in the grit system.  A typical obstruction occurs in one of the grit hoppers…
The Grit Pumps and Hydrogritter operate independently of each other.  During normal operation, influent (containing grit) is pumped by…
The Grit Pumps and Hydrogritter operate independently of each other.  During normal operation, influent (containing grit) is pumped by…
Total results: 1 1

Plant Schematic

El Estero Schematic Drawing