Public Safety Power Shutoffs (PSPS) under consideration in Parts of Santa Barbara County.

14387

We are working on economic and public safety response time analysis. Our next City Council meeting on the State Street Master Plan is anticipated in September 2025. 

14531

The Eastside Library will be partially closed from July 7-12.

14416
Title

O & M Manual

Sections
10 Preliminary Treatment
The primary objective of the Preliminary Treatment System is to prepare raw sewage for further treatment in the downstream processes.…

SOP Content Pages

Grit production below 160 gpm may indicate an obstruction in the grit system.  A typical obstruction occurs in one of the grit hoppers…
The Grit Pumps and Hydrogritter operate independently of each other.  During normal operation, influent (containing grit) is pumped by…
The Grit Pumps and Hydrogritter operate independently of each other.  During normal operation, influent (containing grit) is pumped by…
Total results: 1 1

Plant Schematic

El Estero Schematic Drawing