All SBPL locations will be closed from 12/22-12/26 and on 1/1/26 for the winter holidays. For all the details about adjusted hours and closures, visit our Winter Holiday Hours page.

17112
Title

O & M Manual

Sections
10 Preliminary Treatment
The primary objective of the Preliminary Treatment System is to prepare raw sewage for further treatment in the downstream processes.…

SOP Content Pages

Grit production below 160 gpm may indicate an obstruction in the grit system.  A typical obstruction occurs in one of the grit hoppers…
The Grit Pumps and Hydrogritter operate independently of each other.  During normal operation, influent (containing grit) is pumped by…
The Grit Pumps and Hydrogritter operate independently of each other.  During normal operation, influent (containing grit) is pumped by…
Total results: 1 1

Plant Schematic

El Estero Schematic Drawing