TRAVEL NOTICE 6/29–7/18: HWY 217 between Hollister Ave and Sandspit Rd will be closed overnight (10 PM–6 AM) from Monday night through Saturday morning each week. Please use HWY 101/Fairview Ave exits or an alternate route. Project info

19358
Title

1 In-Plant Spill

This SOP describes the actions that take place when the spill of any process fluids within the fenceline of the El Estero Wastewater Treatment Plant takes place.

SOP Identification Number
SOP Identification Number:
1 In-Plant Spill
Equipment, Supplies, Required Tools
Equipment, Supplies, Required Tools:

Sand bags located in the Solids Handling Building.

Procedure
Procedure:
  1. Immediately notify other personnel of the spill in the order identified below:
    1. Wastewater Treatment Supervisor
    2. Operations Staff
  2. If you know where the spill is originating from and you can quickly isolate it after notifying others, then do so immediately!
    1. If you are by yourself, first place sand bags around downstream storm drains before attempting to isolate the spill.
    2. Sand bags are located in the Solids Handling Building.
  3. Working with other staff, place sand bags around downstream storm drains
    1. Sand bags are located in the Solids Handling Building.
  4. Once sand bags have been put in place, contact Collections to have them use the Vactor to clean up the spill.
  5. Notify Maintenance for any mechanical support.